Our Projects

Showcasing notable mining and engineering work that includes precision drilling, controlled blasting, and large-scale excavation, delivered with safety, accuracy, and efficiency.

Chromite Ore Mining Project

Location icon Great Dyke Region, Zimbabwe Duration icon Jan 2023 – Nov 2024

A multi-phase open-pit operation focused on selective extraction of high‑grade chromite seams. The project integrates precision drilling and controlled blasting with optimized load‑and‑haul cycles to maximize recovery while maintaining strict safety and environmental controls.

Scope of Work

Planning iconGeological mapping, pit design, and blast pattern optimization.
Drilling iconProduction drilling using calibrated rigs for tight collar accuracy.
Blasting iconControlled blasting with vibration monitoring near haul roads and plant infrastructure.
Haulage iconLoad‑and‑haul, ROM stockpiling, and ore/waste segregation.
Safety iconSafety management, QA/QC reporting, and environmental compliance.

Key Highlights

Efficiency icon14% reduction in drill‑blast cycle time through pattern refinements and real‑time supervision.
Precision iconFragmentation within target P80 range, reducing primary crusher choke events.
Sustainability iconDust and vibration kept below regulatory thresholds across sensitive zones.
Team iconZero Lost‑Time Injuries throughout the active phases of the project.
Colorful, vibrant chromite open‑pit mining scene with excavators and haul trucks under a dramatic sky
Open‑pit gold mining scene in the Makkah desert with excavators and haul trucks

Makkah Gold Mining Project

Location icon Makkah Region, Saudi Arabia Duration icon 18 Months (Planned)

Planned gold mining project in the Makkah region, scheduled for execution within the next 18 months. The project emphasizes sustainable mining practices, efficient resource utilization, and compliance with regulatory requirements.

Scope of Work

Planning and design iconGold ore extraction planning
Drilling operations iconControlled drilling and blasting
Site preparation iconSite preparation and excavation
Sustainability iconImplementation of sustainable mining practices

Key Highlights

Sustainability performance iconSustainability-focused project design
Methodology and precision iconAdvanced mining methodologies
Operational planning iconLong-term operational planning

<br/>

Riyadh Urban Infrastructure Project

Location icon Riyadh, Saudi Arabia Duration icon Jan 2023 – Nov 2024

<br/>

Precision rock blasting and excavation works supporting a major urban infrastructure development in Riyadh. The project requires careful execution to ensure safety, accuracy, and minimal impact on surrounding urban areas.

Scope of Work

Planning iconGeological mapping, pit design, and blast pattern optimization.
Drilling icon<br/>
  • Controlled excavation works.
Blasting icon<br/>
  • Vibration and safety monitoring.
Haulage icon<br/>
  • Coordination with infrastructure contractors.

Key Highlights

Efficiency icon<br/>
  • High-precision urban blasting.
Precision icon<br/>
  • Strict safety and compliance standards.
Sustainability icon<br/>
  • Minimal disruption to surrounding areas.
Open‑pit mining operation with excavators and haul trucks working on rock benches

Ready to start your next project?

Share your scope and constraints—we’ll propose a tailored plan that maximizes safety, productivity, and value.